OFFSHORE
ENERGY
OFFSHORE ENERGY
References
01
Equinor
REFERENCES
EXECUTION OF LEAK WATER LINE AT MONGSTAD
Prosjekt Equinor – Lining 3“-4“-8“Job Executed for costumer Aker Solutions
3.2 km total pipe have been lined where the Leak water was from Johan Sverdrup field.
02
Equinor
REFERENCES
FLOTATION TANKS ON SFA AND GFA
Equinor – Flotation tanks. Job Executed for costumer Equinor
Total lamination of flotation tanks with extended life. Build in a 7-layered system including 2 layered polyester cloth 2.5mm.
03
Equinor
REFERENCES
LINING "3-4"-8"
Equinor – lining. Job Executed for costume Aker Solutions
Caisson 36, dimentions 26’’/DN660, pipe in Carbon Steel + 2 x 3.5 m Spools with 12” connections Produced water.
Constant temperature 80˚C Peak temperature 99˚C
04
EQUINOR
Gullfaks A LQ
DRAINPIPE REHABILITATION
Equinor – Open drain lining rehabilitation. Job Executed for costumer Equinor
Rehabilitation of drainage system from level 3 to level 9 (L11-L12-L13), including the open drain, kitchen, laundry room, and cabin annex.
The full lining of the entire pipe system in the living quarters. Pipe dimensions range from Dn.70 to DN150, using Loro-x pipes. The inner lining of corroded pipes was carried out without disrupting living quarters, with no need for disassembly or posing any risk to health, safety, or the environment. The work was done as a closed system, ensuring a safe and efficient process for sewage rehabilitation.
05
Moreld Apply
Gullfaks C 2023
INNERLINING OF COLLECTOR PIPE
Moreld Apply – Innerlining of collector pipe for torch to liquid separator
We conducted inner lining of the collector pipe for the torch to the liquid separator in LT torch 43-VD02. The project involved epoxy lining of a fully welded 12˝ collector pipe, including branches through the firewall. The pipe dimensions, tank, pressure, and temperature specifications are as follows: 12" -6" Pipeclass AC17 sch20.
Job Description: Our scope of work included cleaning and applying a DN300 Epoxy liner over a 15m length. Additionally, we performed up milling of the 8˝ and 6˝ branches and installed 2 top hats to complete the project.
06
Equinor
Sleipner R
OPEN DRAIN SYSTEM
56_SLR/2023
Equinor – Rehabilitation of open drain system from Upper mezz-deck to under Main-deck
We completed a full epoxy lining from stake/blind flanges and all drain-boxes, extending from the beginning to the end above the sea. The pipe dimensions, tank, pressure, and temperature specifications are as follows: DN 250/DN 200/DN 150/DN 100 carbon steel.
Job Description: Our scope of work involved installing an inside epoxy liner in the open drain pipes leading out to sea, including support pipes/reinforcement from the top deck on the Sleipner R platform. Before applying the epoxy liner, we thoroughly cleaned the inside corrosion throughout the entire pipe system. Additionally, we installed Y-liners in other branches.